Paykar bonyan panel factory near Teheran by ARAD

arad_paykar_09

All images and information courtesy of ARAD

Paykar bonyan panel factory near Teheran designed by ARAD ( Architectural Research And Design)

Paykar bonyan panel factory

arad_paykar_04The project: is a factory that contains a prefabricated building system production plant plus an office & ancillary building.

arad_paykar_01
Site: The site location is an industrial city for non-pollution factories, 35 kilometer away from Tehran/ Iran.

arad_paykar_21

The Client Goal: is to change the traditional construction system to an industrial building system which can fulfill the enormous demand of construction in Iran. The client, therefore, wanted the factory to be indicative of this goal in terms of architectural quality in industrial building system with no resemblance to traditional factories in Iran.

arad_paykar_18
The program: is a 3700 sqm production plant with a 350 sqm mezzanine for settlement of technical management team and 500 sqm for technical office and showrooms and mechanical room that must be close to and with a good access to the production plant. There is also a 500 sqm management building with a VIP suit and receptions that is connected to the main bldg with a bridge.
The ancillary building with 200 sqm area is in a separate building in the site.

arad_paykar_24
Building Morphology: These types of buildings always possess some characteristics such as large span, modular structure and homogeneous space.
Architectural Concept: (everything happens @ once) Architect’s approach towards designing a distinctive building is to bear in mind the above-mentioned characteristics.
As regards this project, not only the characteristic aspects have been regarded but also we have been able to get the maximum use of a kind of architecture which provides for all quantitative and qualitative architectural demands.

arad_paykar_06
Geometry of space: (The geometry can make us either murderers or lovers)
The emphasis was to apply a simple geometry of space to be able to meet all the prospects foreseen in the project such as the program and the required connectivity and moreover be able to create a new atmosphere which makes turn a globe either in section or in plan as
well as the project fa├žade ( interior and exterior) into a homogeneous object.
The building is located North-South lengthwise and the main administration building which overlooks Alborz mountain has a uniform glass view.

Project team:

Client: Paykar bonyan co.
Architects: (ARAD co.): Bahram Kalantari, Kourosh Dabbagh
Design team: Majid Pazhuhi , Niloofar Niksar
Technical team: Anoushiravan Kharrazi, Mehdi Holakouie, Mona haddadi
Project manager: Eskandar Hadjizadeh
Structural consultant: Behrang Baniadam (Afarinesh consulting co.)
Mechanical consultant: melkon sarkezians
Electrical consultant: Vahid morteza ghasemi
Main contractor: Afarinesh consulting co.
Photography: Kamran Adl (pic no. 06,07) , Ali Daghigh (remaining pics)

Project specification:

Site location: parand industrial city,Tehran,iran
Site surface: 10500 sqm
Built surface: 4200 sqm (40%)
Total built area: 5250 sqm (50%)
Green area: 1000 sqm (10%)
Production plant: 3700 sqm
Technical management mezzanine: 350 sqm
Technical design office: 350 sqm
Show room: 100 sqm
Management office: 300 sqm
Vip suite: 100 sqm
Mechanical zone: 150 sqm
Ancillary building: 200 sqm
Project cost: 250 euro per sqm (total cost:1/310/000 euro)